Templates and assigning them.

Templates

There are two types of templates in the template list:

Example Templates (Local Templates) - which can be loaded at implementation or through change requests that have been created by Atamis to support standard procurement processes. These templates are managed at an organisational level. These provide a framework from with clients can build out and adapt their own specific templates as required…

Users can also clone, edit or create their own templates

For Public Sector Clients Atamis also have example templates to support procurements under Regs 1, regs2 and regs3 (e.g.PA2023)

Templates can contain any or all of the following related lists:

  • Team members
  • Tasks (the dates are calculated dynamically from your desired contract start date)
  • Requirement sections, requirements and picklist options
  • Framework Suppliers and Lots
  • Supplier document folders and documents
  • Internal document folders and documents
  • Contract KPIs or SLAs
  • Public Sector Noticing Templates
  • FTS/OJEU Notice templates

When assigning a template, metadata fields on the template do not override the values on your project. However, when creating a new projecting from template, the metadata fields on the template are copied directly to your project.

If you would like to specify which fields you would like copied from Template to your Project, please contact support@atamis.co.uk

 

Assign a Template

Once a project has been created, it is possible to assign a template. This is done by clicking Assign Template button as seen in the screenshot below:

There are several filters applicable when you land on the Assign Template to Project page:

Filter Available Options
Template Type
  • Local
  • Managed
Pre-procurement activity?
  • Yes
  • No
Calling Off a Framework?
  • Yes
  • No
Select Gateway Approval Needed?
  • Yes
  • No

By clicking on Apply Filter(s) you will then be presented with a number of templates which match the results of the filters:

After choosing a template by ticking the relevant template tick box, click Confirm Template.

You will then be asked for the Desired Contract Start Date:

  1. The system will calculate the recommended Contract Start Date based on the template you have selected. 
    To use the recommended start date, just click Done.

Alternatively, select a different contract start date if required. 
The tasks on your project will be calculated backwards from the Contract Start Date

Updated