Calling off a framework

Overview

This guide explains how to successfully create a call-off contract from an established framework record within the Atamis system.


Prerequisites: Setting up the Call-Off Template

Before creating a call-off, you must ensure the correct call-off template is applied to your parent framework record.

  1. Navigate to your Framework record.
  2. Click the Assign Template button in the top right-hand corner. 


     
  3. Select and apply the relevant template. This will automatically populate your framework with a workflow (a series of tasks) and requirement sections (which can be associated with specific lot numbers).

Step-by-Step: Creating the Call-Off

Step 1: Copy the Framework Name

💡 Pro Tip: Before starting the call-off process, highlight and copy the exact name of your Framework. This will make it much easier to locate in Step 3!

Step 2: Initiate the Call-Off

  1. On your Framework record, navigate to the Call Offs tab.
  2. Click the New Record button. 
     


     

Step 3: Enter Contract Details

You will be taken to a "New Project From Template" screen.

  1. In the Contract Name field, type the name of your new call-off project.
  2. In the framework list below, use Ctrl+F (or Command+F on a Mac) and paste the Framework name you copied in Step 1 to easily find it. 

     
  3. Select the tick box next to your Framework.
  4. Click Confirm Framework.

Step 4: Select Lots and Suppliers

  1. Select Lots: If your framework utilizes lots, a new screen will ask you which lot(s) you wish to call off against. Check the box next to the relevant lot (e.g., Lot 2).
  2. Select Suppliers: A list of suppliers approved specifically for that lot will appear. Check the boxes next to the individual suppliers you want to include in this call-off, or select all of them. 
  3. Click Confirm.

Step 5: Finalize Dates

  1. Enter your Desired Contract Start Date. (Note: You can also leave this blank and update it later).
  2. Click Done.

Step 6: Managing Your New Call-Off Record

The system will now generate a brand-new Call-Off record. It automatically pulls across all workflow activities, your selected suppliers, and requirement sections from the parent framework.

  1. Clean up Requirements: Navigate to the Requirements tab. Because the system brings over all requirement sections from the parent framework, you should delete any sections you do not need for this specific call-off.  
  2. Proceed as Normal: From this point onwards, your record is a standard project and you can manage the call-off workflow exactly like a normal project in Atamis.

How to Verify the Framework Link

Your new Call-Off is permanently linked to the Parent Framework. You can view this connection from both records:

  • From the Call-Off: Go to the Details tab. You will see a field called Parent Contract with a clickable link that takes you straight back to the main framework.
  • From the Framework: If you view the parent framework and click on the Call Offs tab, you will now see your newly created call-off listed there.

Tags: Call-Off, Frameworks, Assign Template, Lots, Procurement